What we install
- Sinks, faucets, tubs and showers.
- Toilets and bidets.
- Garbage disposals and dishwasher connections.
- Hose bibs, shutoff valves and pressure regulators.
- Rough-in plumbing for new bathrooms, kitchens and laundry rooms.
- Water softener and filtration hookups.
For specific fixtures, see our pages on toilet repair and installation, faucets and garbage disposals.
Planning a remodel: the order of work
Plumbing happens twice in a remodel. The rough-in goes in before walls close, and the fixtures go on after finishes. Getting the rough-in right matters more than anything else, because moving a drain after the slab or wall is done is expensive.
| Stage | Plumbing task | Why it matters. |
|---|---|---|
| Layout | Confirm fixture locations and drain slopes | Drains need slope to work. |
| Rough-in | Run supply and drain lines, set tub and shower valves | Done before drywall. |
| Inspection | Permit inspection of rough-in | Required before closing walls. |
| Finish | Set toilets, sinks and faucets | After flooring and paint. |
| Final | Test, check for leaks, final inspection | Signs off the work. |
Slab or crawlspace: where the lines go
In a slab house, new drains may mean cutting concrete. In a house with a crawlspace, lines run below the floor. A plumber surveys access first, because it changes the cost of adding a bathroom or moving a kitchen sink.
If you are adding a second bathroom, ask about the capacity of your existing drain and the water heater. See water heater replacement if the new load is more than the current one can handle.
Permits and code in Valencia County
New Mexico adopts the 2021 Uniform Plumbing Code, and the Construction Industries Division issues plumbing permits. The Village handles zoning. A licensed plumber pulls the permit and schedules inspections.
Ask to see the permit before work starts. It protects you at resale.
What shapes plumbing installation pricing
A written price comes after the plumber sees the space.
Scope
One fixture versus a full bathroom.
Access
Slab cutting or open framing.
Fixtures supplied
Yours or the contractor’s.
Distance from existing lines
Longer runs cost more.
Permit and inspection
Fees and time.
Installation is planned work and not an insurance matter. Want your real number? Call and describe the project.
Planning a remodel or addition?
Call to schedule a plumbing walkthrough.
Fixtures that need special rough-in
Some fixtures need more than a drain and two supply lines. A freestanding tub needs a floor drain placed precisely under the tub. A walk-in shower needs a pan, a waterproof membrane and the right slope. A wall-hung toilet needs a carrier framed into the wall.
Tell the plumber the exact model before the walls close. A fixture chosen late can force the wall open again. If you are still choosing, ask the plumber for the rough-in dimensions of your top two picks.
Planning around your schedule
Plumbing is one trade among several in a remodel. The plumber needs framing done before rough-in and drywall waiting until the rough-in inspection passes. Tile, cabinets and countertops follow, and the finish plumbing comes last.
Share your timeline when you call. A plumber who knows your tile date can schedule the rough-in with room to spare, and the final visit lands after the countertops are set.
Water heaters, gas lines and appliances
New kitchens often add a gas range or a larger water heater. Gas work calls for the right license and a pressure test. If your remodel includes either, mention it at the walkthrough so the plumber can size lines correctly.
See water heater installation and tankless units if your load is changing. Appliances such as ice makers and pot fillers add small supply lines that are easiest to run before the wall is closed.
Plan review and inspections
New plumbing follows the Uniform Plumbing Code (UPC) as adopted in New Mexico. The state Construction Industries Division issues the permit, and inspectors check the rough-in before walls close and the finish at the end. Build those inspection dates into your project schedule.
Plumbing installation questions
Yes. We coordinate rough-in and finish stages with your schedule.
Yes in most cases. The state issues plumbing permits.
Usually. The cost depends on the drain and supply routes.
Either way. Tell the plumber what you have chosen.
Often a day or two, depending on access.
Yes. See Peralta.